{
 "source": "uspvdb_v4_0_20260414.zip",
 "all_utah": {
  "sites": 53,
  "mw_ac": 2117.7,
  "acres": 13987
 },
 "kept": {
  "sites": 48,
  "mw_ac": 1804.4,
  "acres": 11760,
  "median_acres_mw": 5.87,
  "median_ha_mw": 2.37,
  "min": [
   "SF Auto O1",
   3.02
  ],
  "max": [
   "Three Peaks",
   8.96
  ]
 },
 "by_mount": {
  "fixed-tilt": {
   "sites": 11,
   "median_acres_mw": 4.85
  },
  "single-axis": {
   "sites": 36,
   "median_acres_mw": 6.26
  },
  "dual-axis": {
   "sites": 1,
   "median_acres_mw": 3.39
  }
 },
 "corridor": {
  "counties": [
   "Beaver",
   "Iron"
  ],
  "sites": 28,
  "mw_ac": 1017.5,
  "share_mw": 0.564
 },
 "left_out": {
  "Appaloosa Solar I": "digitizing confidence 3",
  "Red Mesa Solar Project": "imaged 2023-01-12, at the start of its operating year",
  "Salt Palace Solar Gen Plant": "rooftop array",
  "Castle Solar, LLC": "imaged 20231127 before its 2024 start",
  "Elektron Solar, LLC": "digitizing confidence 3"
 }
}